Website Redesign

At risk
9 of 24 done · due Aug 2
APLM
This project is at risk — “Homepage hero” has been blocked 4 days on Design System 2.0’s token export and sits on the critical path to the Aug 2 freeze. 3 downstream tasks wait on it.
Because
AI summaries are read-only and scoped to this workspace (workspaceId). Rate them to tune relevance — they never edit the task.